2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat

2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat

Regular price
$21.99 USD
Sale price
$21.99 USD
Regular price
$55.00 USD
Sold out
Unit price
per 
Shipping calculated at checkout.

 Description:

  • DURABILITY AND SAFETY- This dog training leash is made of sturdy nylon, which is durable and perfectly protects your dog. Chrome-plated hooks enhance 360° rotation at the joint.
  • COMFORTABLE HANDLE-  The ergonomic non-slip handle is easy to grasp and provides a pleasant walking experience for your pet, without worrying that the dog leash will hurt your hand.
  • EASY TO USE- Quick lock, pause and unlock buttons-easy to operate with your thumb. No tangles, it is very suitable for walking, jogging, running, camping and hiking, or going out for a leisurely stroll in the backyard.

Brand Name: STEVVEX Pets
Model Number: ST12DB767QWS

Type: Leashes
Dog Leash Type: Double Leashes
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: LIGHTS

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)